This is the upstairs hall bathroom. Although we have not done a complete remodel on any of our three bathrooms, we have done some small updates to make them more comfortable. For instance, in the two upstairs baths, we added ducts and vents for A/C. Originally, there was no A/C in the bathrooms and the only heat came from those old wall heaters. We also painted, installed new medicine cabinets {the original ones had fluorescent lights on each side and only one plug outlet}, added two-arm lights over the medicine cabinet, and added a plug to the wall.
For this bathroom, our future plans included moving the doorway out to the hallway and consuming the linen closet. That would allow plenty of room for a double-sink vanity AND a small linen closet. All of this without having to move any plumbing... which always adds to the cost of the remodel project. In the photo below, you can see the linen closet just outside the bathroom. And in the last photo, there used to be a cabinet built into the wall that was almost 3.5 feet deep. A complete waste of space because you couldn't reach anything in the back. It was built over the staircase leading down to the basement. We ripped it out and opened up the stairwell, which made a huge difference.
No comments:
Post a Comment